Nouakchott–Boutilimit toll motorway
Illustrative photoPublic-private partnership feasibility study for a 155 km toll motorway, followed by the detailed design and tender documents. Carried out in a consortium with PEP Engineering, Taylor Wessing, C5P and Gibraltar.
Key figures
- km
- 155
Services provided by GIPER
- Data collection and site reconnaissance
- Traffic study
- Geometric design and preliminary quantities
- Hydrological and hydraulic study
- Geotechnical studies and pavement design
- Economic study
- Feasibility report and choice of options
- Detailed design (APD)
- Tender documents (DAO)
In the same sector
Roads and transport
Illustrative photo